You are reading

TF Cornerstone Files Plans to Build Two New Towers in Long Island City, To Contain 1,400 Units

TF Cornerstone towers going up (Photo: Queens Post)

Dec. 17, 2020 By Christian Murray

TF Cornerstone has filed plans to construct two new residential towers on 2nd Street, directly behind the massive Hunters Point South development.

The first tower, according to plans filed with the Dept. of Buildings on Dec. 14, would be located on the corner of 2nd Street and 54th Avenue and would be 34 stories tall and contain 575 units. The second building proposed would be located at 54-01 2nd Street and would be 39 stories and contain 812 units.

The company is permitted to build towers of this size, since the lots are part of the Special Southern Hunters Point District that was created in 2008. That district was established with the sprawling Hunters Point South development in mind, although these two parcels were not part of that 5,000-unit mega plan.

The filing comes at a time when TF Cornerstone is close to completing its 1,194-unit project on Parcel C of the Hunters Point South development. Parcel C backs onto 2nd Street.

TF Cornerstone is looking to develop the two sites on the bottom right in red. They are part of the Special Southern Hunters Point District established in 2008 (Source: City Planning)

The company is a prolific builder in Long Island City. It transformed the Hunters Point waterfront by building six residential towers on Center Boulevard (by Anable Basin and the Pepsi sign) over a 10-year period, comprised of 2,615 rental units and 184 condominiums.

TF Cornerstone bought its two development sites on 2nd Street in November 2018 for $285 million. The purchase appeared well timed, since it came days before Amazon said it planned to move to Long Island City. The Amazon plan, however, was abandoned in February 2019 following push-back from a number of elected officials and community groups.

The developer had floated the idea in 2019 of creating a special district that would incorporate its 2nd Street and 54th Avenue sites. The rezoning area proposed would have roughly gone from the Newtown Creek to Borden Avenue—between 2nd Street and 5th Street.

The proposal involved rezoning some manufacturing space surrounding the LIRR tracks and decking over a 3 1/8 acre section of the Yard between 2nd and 5th Streets. The deck was to be used for park space and would connect to Vernon Boulevard.

The plan, however, was not embraced by Community board 2’s Land Use committee in a meeting in 2019.

A rendering of TF Cornerstone’s two-tower development on Parcel C of the Hunters Point South development (courtesy TF Cornerstone)

email the author: [email protected]
No comments yet

Leave a Comment
Reply to this Comment

All comments are subject to moderation before being posted.


The reCAPTCHA verification period has expired. Please reload the page.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Recent News

Dozens of people, believed to be migrants, found living in cramped Queens cellar

Mayor Eric Adams confirmed that dozens of people, believed to be migrants, were found living illegally inside a commercial business in South Richmond Hill on Monday afternoon.

The cellar dwellers were discovered inside an illegal conversion of a 2-story, mixed-use building on Liberty Avenue in South Richmond Hill, according to the city’s Department of Buildings. DOB Inspectors were called to the scene at 132-03 Liberty Ave. by FDNY first responders after fire prevention inspectors acting on a tip found the people living in cramped and illegal conditions.

Brooklyn man charged with manslaughter, DWI, for Astoria collision that killed his wife: DA

New details have emerged in the case against a Brooklyn man who allegedly crashed into several cars in Astoria last week while driving drunk, and then drove off in the wrecked vehicle to a residential block in Maspeth four miles away with a gravely injured passenger. The passenger turned out to be his wife, who later died, and the boozed driver told investigators that the couple was being followed when the collision occurred, according to the criminal complaint.

Rey Perez, 27, of Caton Avenue in Flatbush, was arraigned on Friday in Queens Criminal Court on charges of manslaughter, vehicular manslaughter and other crimes for speeding through stop signs last Thursday morning, crashing into another vehicle and two parked cars, before speeding from the scene to Maspeth where he sought help for his wife, 29-year-old Bridget Enriquez, who later succumbed to her injuries.