You are reading

Renderings Released of 14-Story Commercial Building in Long Island City

Rendering provided by NODE Architecture, Engineering, Consultancy PLC

March 3, 2021 By Michael Dorgan

Renderings of a 14-story commercial building planned for Long Island City have been released by the Manhattan-based architectural firm in charge of the project.

The structure, which is being designed by NODE, is planned to go up at 37-24 10th St. and contain five floors of parking along with warehouse and office space.

The building, which will be called Imbros Lofts, will also include community space and a restaurant with an open-air terrace.

Plans for the structure were approved by the Dept. of Buildings in October. Imbros Lofts is located in an industrial business zone and will not contain residential or retail space.

A 14-story commercial building is planned for 37-24 10th St. in Long Island City (Google)

The plans call for parking on the sub-cellar through third floor, which will total 67 parking spaces. There will also be a lobby and a loading area on the ground floor.

Warehouse space will be on floors 4 through 6, with community center space on floors 7 through 9. The plans call for office space on floors 10 and 11.

A restaurant with an open-air terrace will be on the 12th and 13th floors, according to the plans. The total floor space of the building is 85,157 square feet.

The building is designed to maximize energy efficiency and the top floor will contain solar panels and triple-glazed aluminum windows, according to the NODE website.

The gray cement structure sets back on two levels revealing separate open terrace areas. The building will also have two distinct ornamental navy bands running up its front façade.

Parking spaces will only be available to users of the building, according to a spokesperson for NODE. A construction timeline has yet to be determined.

Imbros Realty is listed as the owner.

Rendering provided by NODE Architecture, Engineering, Consultancy PLC

Rendering provided by NODE Architecture, Engineering, Consultancy PLC

Rendering provided by NODE Architecture, Engineering, Consultancy PLC

email the author: [email protected]
No comments yet

Leave a Comment
Reply to this Comment

All comments are subject to moderation before being posted.


The reCAPTCHA verification period has expired. Please reload the page.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Recent News

CM Moya announces support for massive Metropolitan Park proposal near Citi Field

Council Member Francisco Moya announced his support for Metropolitan Park, a proposal put forward by New York Mets owner Steve Cohen and Hard Rock International that calls for the construction of a casino and entertainment complex on the parking lot just west of Citi Field.

In a lengthy statement released on Thursday afternoon, Moya said that when he was first approached about the project, his main consideration was ensuring that it would meet the needs of his constituents and provide a major boost to the local economy.

Long Island man charged in fatal Flushing hit-and-run that left 81-year-old man dead: NYPD

A Long Island truck driver was arrested on Tuesday and booked at the 109th Precinct in Flushing for a fatal hit-and-run collision that killed a Murray Hill senior who was riding an electric bike on Northern Boulevard three months ago.

Kyle Schreiber, 27, of Lincoln Boulevard in Hauppauge, was charged with leaving the scene of an accident resulting in the death of 81-year-old Peter Seo on the morning of Thursday, Dec. 28.

MTA seizes 19 ‘ghost’ cars registered to toll violators at Queens Midtown Tunnel on Monday

Two days before the MTA Board approved the controversial congestion pricing plan for Manhattan on Wednesday, the agency cracked down on persistent toll violators at the Queens Midtown Tunnel in Long Island City.

MTA Bridges and Tunnels seized 19 vehicles registered to persistent scofflaws on Monday and issued 81 summonses and confiscated two fraudulent incense plates. The MTA noted that the scofflaws accounted for approximately $483,000 in combined unpaid tolls and fees. One of the top persistent toll violators from the targeted enforcement owed nearly $76,000 in tolls and fees.